Commissioning
During this phase of a project, the main focus is on; receiving the selected piece of equipment, verifying that you received the correct equipment, verifying that the key features are present and working properly, and installing the equipment into its prepared area.  
 
   
 
 
Site Acceptance Test

  The purpose of the SAT is to verify that the functionality that was tested under the FAT is still working correctly after transportation and upon arrival at the installation site.  
    
 Equipment Acquisition       Commissioning       Qualification      Signup for the VS Newsletter
Copyright © 2009-2016 Validation Support LLC - All rights reserved

508-367-9469
  Terms Of Use  Privacy Statement
Engineering Study User Requirement Specifications Functional Requirment Specifications Design Qualification Impact Assessment Equipment Bulid Factory Acceptance Test Site Acceptance Test Commissioning Installation Qualification Operational Qualification Performance Qualification Engineering Study Process Validation Re-Qualification Site Acceptance Test Commissioning